Industrial building, head office of the DAMM Factory in El Prat de Llobregat (Barcelona). As it is an industrial building with loading and unloading traffic, it was decided to clad it in two materials, a red colored composite and porcelain in a large format 1200 x 600 mm, starting from the first floor to avoid breakage from impact. The ceramic is positioned maintaining the continuous joints in horizontal and vertical, using hidden anchors. The system used to support this panel cladding was PF-ALU/PLC.



Architect:
Fedde Huistra
Location:
El Prat de Llobregat (Spain)
Year of Execution:
2008
Surface area:
1650 m2
Employed system:
fachadas ventiladas - sistema masa - edificio industrial damn

other projects sistema masa: