Building located in the Industrial Area of Barbera del Vallès – Barcelona (Spain). It was one of the first buildings to use Sintered Ceramic in large sizes, 3000 x 1000 x 3+3 mm of Techlam. For the construction system, the PF-ALU/CER system was used with anchors with visible flanges, due to the low thickness of the cladding, complemented by a spring that acts by putting pressure against the cladding tab and absorbing possible vibrations and the horizontal wind load.


Architect:
Ingeniería Torrella – Josep Torrella
Location:
Barberà del Vallès (Spain)
Year of Execution:
2006
Surface area:
1.350 m2
Employed system:
Revestimiento de fachada - Sistema Masa - Centro logístico engel