One of the services we offer is TECHNICAL ASSISTANCE, from the beginning until the end of the construction of every project.
As GOOD PROFESSIONALS OF THE SECTOR OF THE VENTILATED FAÇADES, we adapt to the needs of every project, collaboration and managing projects of all sizes, and offering “tailor made” solutions. To make this possible, the assistance we offer is very complete, starting with the previous study of the project and until the project is finalised, including the necessary technical training.
Today we want to share a sample of this, as we have recently received the visit of a Canadian company in order to train their installer for a project we will soon begin in Calgary, Canada.
It is the external cladding of the columns from ground level and first floor from the building Mark on 10th; a wonderful building of 37 floors that combines housing with one of the biggest urban gardens in the city.
INSTALLING OUR CLADDING SYSTEMS
The cladding system we are using in this project is the PF-ALU/HPL-120, a system designed to work with stone in vertical format with continuous horizontal joints and free vertical joints it is also a good option for certain projects with horizontal stones and continuous horizontal joints. You can see some of the SISTEMA MASA PROJECTS where this system has been used.
In some of the images you will be able to the process of installation of the sample installed this week to do the training to the Canadian installers.
As GOOD PROFESSIONALS OF THE SECTOR OF THE VENTILATED FAÇADES, we adapt to the needs of every project, collaboration and managing projects of all sizes, and offering “tailor made” solutions. To make this possible, the assistance we offer is very complete, starting with the previous study of the project and until the project is finalised, including the necessary technical training.
Today we want to share a sample of this, as we have recently received the visit of a Canadian company in order to train their installer for a project we will soon begin in Calgary, Canada.
It is the external cladding of the columns from ground level and first floor from the building Mark on 10th; a wonderful building of 37 floors that combines housing with one of the biggest urban gardens in the city.
INSTALLING OUR CLADDING SYSTEMS
The cladding system we are using in this project is the PF-ALU/HPL-120, a system designed to work with stone in vertical format with continuous horizontal joints and free vertical joints it is also a good option for certain projects with horizontal stones and continuous horizontal joints. You can see some of the SISTEMA MASA PROJECTS where this system has been used.
In some of the images you will be able to the process of installation of the sample installed this week to do the training to the Canadian installers.







After each training, we certify our collaborators as they have received the proper training to install Sistema Masa wall cladding systems with security.